Well Kill
Well control
Well Kill
Kill fluid, volumes and pressures for a producing well, or the kill sheet of a drilling well. Pick the method, enter the well, in metric or oilfield units.
Inputs
Result
Check the inputs
Some values are missing or out of range. Correct the highlighted fields to see the result.
Kill fluid density
–
- Formation pressure
- –
- Density increase
- –
- Hydrostatic pressure of the kill fluid
- –
- Tubing volume (bullhead)
- –
- Annulus volume
- –
- Time to pump the tubing
- – min
- Time to pump tubing and annulus
- – min
- Surface pressure at the start of bullheading
- –
- Surface pressure at the end of bullheading
- –
- Bottomhole pressure while injecting
- –
- Margin to fracture pressure
- –
Kill mud density
–
- Initial circulating pressure (ICP)
- –
- Final circulating pressure (FCP)
- –
- Strokes to the bit
- – strokes
- Strokes, bit to surface
- – strokes
- Time to the bit
- – min
- Time, bit to surface
- – min
- Strokes of the whole kill
- – strokes
- Time of the whole kill
- – min
- Maximum allowable annular pressure (MAASP)
- –
Drill pipe pressure schedule
| Strokes | Time (min) | Pressure () |
|---|
While the kill mud goes down the string, hold the drill pipe pressure to this schedule, then hold the final circulating pressure until the kill mud is at surface.
Method
The tool calculates the kill from the balance of hydrostatic pressures.
- Hydrostatic pressure: P = ρ·g·TVD, with g = 9.80665 m/s². The formation pressure is the shut-in pressure plus the hydrostatic pressure of the fluid in the well.
- Producing well: the kill fluid density balances the formation pressure plus the overbalance, ρ = (P + overbalance) / (g·TVD). Volumes are π/4·ID²·L for the tubing and π/4·(casing ID² − tubing OD²)·L for the annulus.
- Bullheading: the surface pressure is the injection pressure (formation pressure plus the pressure needed to inject) minus the hydrostatic pressure of the fluid in the tubing. It starts at the shut-in pressure plus the injection margin and falls as the kill fluid goes in. The bottomhole pressure is checked against the fracture pressure.
- Drilling well: kill mud density = mud density + SIDPP / (g·TVD). ICP = SIDPP + circulating pressure at the kill rate; FCP = circulating pressure × kill mud / mud density. The drill pipe pressure falls linearly from ICP to FCP over the strokes to the bit.
- Wait and weight circulates once with the kill mud. The driller's method circulates the influx out with the original mud first, holding ICP, and then circulates the kill mud. MAASP = (leak-off density − mud density)·g·shoe TVD.
Assumptions
- A vertical column of one fluid: no gas in the fluid, no friction while bullheading and no temperature or compressibility effect on the density.
- Pressures are gauge. Check the kill against the casing, tubing and wellhead pressure ratings.
- The kill sheet is for the method the page names; choke operation and the response to a gas influx need judgement on location.
This tool is a planning aid, not a substitute for the operator's well control procedures and the well control certification of the crew. Check the result against the company's own kill sheet.
The tools are aids for engineers. Check the inputs and the results: responsibility for any decision stays with the user.